Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

NAP inclusivo

Total project amount

13 thousand €

Amount paid

0 €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

03.02.2025

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11417

Summary

Previamente ao início do projeto foi constituída uma equipa multidisciplinar com vista à realização do diagnóstico e conceção da solução a implementar, com o objetivo de definir os requisitos com o grau de maturidade adequada à fase de implementação do mesmo. Efetuou-se o levantamento das necessidades ao nível das infraestruturas/instalações e foram definidas prioridades de acesso a edifícios, em função de valências pedagógicas e de acolhimento de visitantes consideradas essenciais, ou muito pertinentes. Foram identificados os espaços de intervenção, passíveis de adaptação ao projeto a desenvolver e procedeu-se à projeção espacial das soluções técnicas, de acordo com referenciais técnicos disponibilizadas pelo INR. Foi feita uma consulta prospetiva ao mercado para se aferirem os custos envolvidos na resposta às necessidades definidas.Com a aprovação projeto realizar-se-ão um conjunto de atividades, nomeadamente, a elaboração de caderno de encargos e procedimentos relativos à contratação pública do serviço de construção. A instalação dos pontos de acesso no terreno será sujeita a acompanhamento técnico.Para concretizar os objetivos a que se propõe, a CPL considera fazer um conjunto de investimentos, que se interligam entre si, e que perfazem o montante de 16.400,00 €.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 13 thousand € ,
Source EMRP
23.12.2024