PRR Project

Melhoria das condições de acessibilidade a Nave Desportiva a pessoas com mobilidade condicionada

Project sheet

Name

Melhoria das condições de acessibilidade a Nave Desportiva a pessoas com mobilidade condicionada

Total project amount

13 thousand €

Amount paid

0 €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.10.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11294

Summary

Com a presente intervenção pretende-se terminar com a dependência da plataforma elevatória e dotar o espaço de uma infraestrutura física que permita o livre acesso de pessoas com mobilidade condicionada entre os dois equipamentos, sem sujeição de ajuda de terceiros.A solução adotada é uma rampa com inclinação máxima de 5%, com várias plataformas de descanso e rotação intermédias, com uma largura livre de 1,5m que permita o cruzamento de cadeirantes. A rampa é servida por corrimão duplo em ambos os lados (70cm e 90cm) e uma largura de segurança de 30cm para cada um dos lados. A intervenção obriga ainda à abertura de uma porta de acesso ao edifício, porta que deve ser provida de barra antipânico interior e provida de iluminação de sinalização.A rampa será construída em alvenaria de blocos de cimento e betão ciclópico, o pavimento com acabamento adequado a cadeirantes e sinalizada com piso podotável nas entradas (extremos).A Rampa a construir será executada na totalidade dentro do recinto desportivo e pretende-se com a intervenção proposta aumentar os níveis de inclusão de pessoas com mobilidade reduzida, nomeadamente atletas cadeirantes, cumprindo todas as disposições de conforto e segurança.Os investimentos a efetuar cifram-se em EUR 15.001,24 sendo o Valor Máximo do financiamento ao abrigo do Aviso 06/CO3-i02/2024 – Acessibilidades 360º de EUR 13.000,00 . Os custos inerentes ao investimento encontram descritos no anexo III, que faz parte integrante da documentação disponibilizada na presente candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Real de Santo António 13 thousand € ,
Source EMRP
23.12.2024