PRR Project
Integração de Acessibilidades no tanque principal da Piscina Municipal de Mira
Project sheet
Name
Integração de Acessibilidades no tanque principal da Piscina Municipal de MiraTotal project amount
4,89 thousand €Amount paid
1,47 thousand €Non-refundable funding
4,89 thousand €Loan funding
0 €Start date
11.10.2023Expected end date
06.11.2023Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
06/C03-i02/2024.P11269Summary
Como referido no ponto anterior, a operação objeto da presente candidatura consiste na instalação de meio mecânico de acesso à “Piscina” através de um elevador portátil, com comando e capacidade até 136 kg. A solução adotada, permite utilização do tanque principal da piscina municipal por pessoas com mobilidade reduzida.O Município adquiriu este elevador a 30.OUT.2023 e, como tal, a solução proposta já se encontra devidamente implementada na “Piscina”. Assim, consideramos que a presente intervenção é elegível de acordo com o disposto na alínea a) do ponto 4.2.4 do aviso. A intervenção teve em consideração as regras definidas pelo decreto-lei nº 163/2006 de 8 de agosto, nomeadamente no que diz respeito à aquisição de meios mecânicos de acesso à água.A intervenção em epígrafe enquadra-se na secção 3.4.3 das NTA, cujo investimento proposto ascende a 4 890,00€ (sem IVA).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
4,89 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Mira 4,89 thousand € ,