Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

RGPD

Total project amount

14,67 thousand €

Amount paid

4,4 thousand €

Non-refundable funding

14,67 thousand €

Loan funding

0 €

Start date

01.03.2024

Expected end date

30.11.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

05/C03-i02/2023.P8120

Summary

A operação pretende promover a melhoria da acessibilidade da pessoa com deficiência visual, no edifício habitacional existente.A intervenção prevê a implementação de soluções de domótica, facilitadoras da gestão doméstica, através da instalação de robótica adaptada à deficiência visual da pessoa, possibilitando a utilização de comando de voz para controlo da iluminação, tomadas e sistema de alerta contra colisão em obstáculos através de sensores. Prevê-se também a aquisição de eletrodomésticos com possibilidade de controlo remoto, comandos facilmente manuseados e descodificados pelos utilizadores, no caso a placa, forno e máquinas de lavar louça e roupa, permitindo assim a melhoria significativa da gestão dos trabalhos domésticos e a respetiva execução em condições de segurança.Atendendo a deficiência visual da destinatária final, a intervenção vem também propor a criação de um percurso acessível, facilmente detetável e transitável em segurança, através da substituição de parte do pavimento do logradouro para piso tátil, implementação de corrimãos nos vãos de escadas interiores e exteriores e de portão seccionado com sistema de abertura automático.Através das intervenções e aquisições propostas, cumpre-se o objetivo de melhorar significativamente a gestão da residência não somente ao nível da edificação, mas ainda da própria gestão das tarefas domésticas da pessoa deficiente visual, bem como dos restantes membros familiares.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

14,67 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Braga 14,67 thousand € ,
Source EMRP
23.12.2024