Name

Execução de obras de adaptação/melhoria de Acessibilidades

Total project amount

15,2 thousand €

Amount paid

0 €

Non-refundable funding

15,2 thousand €

Loan funding

0 €

Start date

01.10.2024

Expected end date

31.03.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

05/C03-i02/2023.P8032

Summary

No âmbito desta candidatura, pretende-se dotar a habitação unifamiliar existente de condições de acessibilidade. De acordo com os critérios para classificação da obra por nível de intervenção, definidos no quadro I do anexo à portaria nº 301/2019 de 12 de setembro, considera-se que a pretensão constitui uma ‘intervenção simples (N1)’. O plano de acessibilidades evidencia as medidas adotadas e contém as peças necessárias à identificação dos percursos acessíveis e das zonas de permanência da habitação, bem como das restantes soluções de acessibilidade previstas em projeto, enunciando e caracterizando as diferentes medidas de compensação ou mitigação adotadas. Pretende-se garantir a acessibilidade com autonomia de utilizadores com mobilidade condicionada, incluindo utilizadores de cadeira de rodas, na utilização de, pelo menos, uma parcela acessível por habitação, nas comunicações verticais e horizontais, quer nos pisos quer entre os pisos, bem como estacionamentos, arrecadações e logradouros, mediante a adoção de soluções tecnológicas e mecanismos de apoio onde necessário.Assim sendo, propõe-se:- Alteração de instalação sanitária (substituição de loiças sanitárias)- Arranjos exteriores (execução de plataforma e rampas)- Roupeiro (substituição por sistema acessível) - Substituição de vãos envidraçados (substituição por sistema acessível)

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

15,2 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Alcobaça 15,2 thousand € ,
Source EMRP