Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

RGPD

Total project amount

9 thousand €

Amount paid

2,7 thousand €

Non-refundable funding

9 thousand €

Loan funding

0 €

Start date

03.06.2024

Expected end date

31.10.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

05/C03-i02/2023.P7850

Summary

O projeto apresentado refere-se à implantação de uma rampa no espaço público, na zona adjacente à entrada de um edifício multifamiliar, a diferença de cotas entre a via pública e o átrio edifício é de 0,51m. A obra permitirá a acessibilidade à porta de entrada do edifício a partir do espaço público. O R/c Direito do edifício localizado na zona do Valbom em Alcochete encontra-se alugado pela Câmara Municipal e a inquilina apresenta mobilidade reduzida, deslocando-se em cadeira de rodas, pelo que a intervenção se mostra necessária e urgente.Optou-se por elementos metálicos em toda a estrutura da rampa com as ligações soldadas entre si. Está prevista a proteção anti corrosão em todos os elementos estruturais (exceto a grade de piso cujo o material é aço galvanizado). O acabamento final será composto por tinta na cor vermelha à semelhança da caixilharia e guarda corpos existentes no edifício.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

9 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Alcochete 9 thousand € ,
Source EMRP