PRR Project
RGPD
Project sheet
Name
RGPDTotal project amount
2,99 thousand €Amount paid
895,82 €Non-refundable funding
2,99 thousand €Loan funding
0 €Start date
01.02.2024Expected end date
31.05.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
05/C03-i02/2023.P5812Summary
Com a apresentação desta candidatura é proposto que a fração seja 100% acessivel no seu interior, efetuando alterações previstas no aviso de Investimento Nº 5 RE-C03-i02 -/2023 contempladas no ponto 4.1.2 OI.2|Interior da habitação, alínea l), ponto i, Substituição de eletrodomésticos com comandos facilmente descodificados pelo utilizador: a) Micro-ondas de encastre, marca HAIER HWO38MG4HXB com capacidade 25 L - Com Grill - Preto;b) Máquina de lavar roupa, marca SAMSUNG WW90T554DAW 9 KG A;c) Aspirador Robô marca Roomba IROBOT J7 Grafite;d) Smart TV marca SAMSUNG TQ43Q68CAUXXC (QLED - 43´´ - 109 cm - 4K Ultra HD);e) Placa de Indução Acessivel 4 Discos, marca Kochheld;f) Balança de cozinha Vivienne, marca Caretec; modelo Vivienne - ISO 150303;g) Balança de casa banho com voz PT – Happyday, marca Caretec; modelo Happyday - ISO 094806;h) Colorino de voz Portuguesa, marca Caretec; modelo Colorino - ISO 270624;i) Leitor de etiquetas LEO, marca Kero; modelo Leo - ISO 223003;j) Medidor de tensão arterial c/ voz PT, marca Oregon; modelo ITH80084-ISP - ISO 042409.O custo total da intervenção é de 3.096,00€ sendo o custo comparticipado de 3.096,00 €.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
2,99 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Cascais 2,99 thousand € ,