PRR Project
RGPD
Project sheet
Name
RGPDTotal project amount
2,73 thousand €Amount paid
0 €Non-refundable funding
2,73 thousand €Loan funding
0 €Start date
01.01.2024Expected end date
31.12.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
05/C03-i02/2023.P5647Summary
Relativamente às ações, e face ao exposto no enquadramento do projeto, propõe-se a substituição da banheira por base de duche e do chuveiro por coluna acessível, de acordo com as necessidades e em cumprimento com o n.º 3.3.4 da Normas Técnicas de Acessibilidades, (Ver Anexo V) e conforme se encontra detalhado nas peças desenhadas nos Anexos da presente Candidatura. De igual forma, propõe-se a remoção da porta existente, alargamento da passagem e colocação de porta de correr. Optou-se por colocar uma porta de vidro fosco porque a porta terá que correr por dentro do compartimento atendendo à falta de espaço no espaço exterior, e como tal, torna-se necessário que a mesma seja resistente à água e humidade, por outro lado, desta forma também é possível economizar espaço interior. As alterações sugeridas, promovem assim melhorias em matéria de acessibilidade, segurança, conforto e eficiência no acesso aos espaços interiores da habitação, nomeadamente, no acesso e uso da instalação sanitária.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
2,73 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Faro 2,73 thousand € ,