Name
RGPDTotal project amount
6,21 thousand €Amount paid
0 €Non-refundable funding
6,21 thousand €Loan funding
0 €Start date
01.01.2024Expected end date
31.12.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
05/C03-i02/2023.P5642Summary
As ações em questão serão a melhoria no acesso à habitação, no interior do logradouro privado, onde existem vários degraus que dificultam o acesso do exterior para o interior da habitação (ver Anexo V). Propõe-se deste modo a construção de uma rampa de acesso, garantindo assim mais valias em matéria de acessibilidade, conforme se encontra detalhado nas peças desenhadas nos Anexos da presente candidatura.De igual modo, a instalação sanitária existente não permite a acessibilidade em cadeira de rodas, devido ao facto da largura da porta ser insuficiente, devido às reduzidas dimensões interiores e das características dos equipamentos sanitários (ver Anexo V). Propõe-se o alargamento da porta de acesso à instalação sanitária, bem como a remodelação interior da mesma e colocação de equipamentos sanitários acessíveis, de acordo com o n.º 3.3.4 das Normas Técnicas de Acessibilidade. As alterações sugeridas, promovem assim, melhorias em matérias de acessibilidade, segurança, conforto e eficiência, quer no acesso à habitação, quer no acesso e utilização da instalação sanitária.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
6,21 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-