Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

EstágiAP XXI - 2ª edição

Total project amount

70,73 thousand €

Amount paid

64,01 thousand €

Non-refundable funding

70,73 thousand €

Loan funding

0 €

Start date

03.01.2023

Expected end date

20.08.2025

Dimension

Digital Transition

Component

Digital public administration

Investment

Empowering public administration to generate real public value

Operation code

04/C19-i07.05/2022.P396

Summary

As ações inerentes a este projeto decorreram com base no definido na Resolução do Conselho de Ministros n.º 11/2021, de 03.03, que criou um programa extraordinário de estágios na administração direta e indireta do Estado, destinado à carreira de técnico superior, denominado «EstágiAP XXI», tendo sido o INA a entidade responsável pela coordenação do referido Programa. Os jovens interessados realizaram online, a sua candidatura através do portal da BEP. No âmbito do Programa «EstágiAP XXI» foram atribuídas 10 vagas ao IGeFE, IP., tendo posteriormente apresentado as áreas de formação académicas pretendidas para a distribuição das vagas.Consequentemente o IGeFE irá desenvolver as seguintes ações:• Pedido de cabimento orçamental para as 10 vagas;• Contratualização do Seguro de acidentes de trabalho obrigatório para o programa;• Homologação por parte da DGAEP, da lista de candidatos colocados no referido programa;• Pedido de envio de Curriculum Vitae de todos os candidatos para adequação do perfil de cada estagiário a cada departamento;• Designação em cada departamento, de um orientador de estágio durante 9 meses;• Formalização de 10 contratos, com efeitos de 01.10.2022 a 30.06.2023;• Aprovação dos planos de estágio com o cumprimento de 3 objetivos previamente definidos; • Início dos Estágios no dia 01.10.2022;• Ação de Acolhimento e integração dos 10 estagiários na primeira semana de Outubro de 2022;• Este Programa prevê uma componente formativa, sendo a mesma promovida pelo INA através da plataforma de e-learning, com uma duração estimada de 8 horas; • Preenchimento da Ficha de avaliação dos estagiários e decisão sobre a avaliação final.No final do estágio receberão um certificado comprovativo de frequência e aprovação final no estágio, bem como uma descrição das atividades desenvolvidas e dos conhecimentos adquiridos. O acompanhamento e a execução deste projeto envolve vários recursos humanos do instituto, uma vez que os estagiários estão afetos a diversas equipas, por forma a capacitar a execução de cada um deles com o conhecimento e experiência relevante para ambas as partes interessadas.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

16,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

70,73 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 90,5 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 70,73 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading