Project sheet

Name

105 - Viagem dos Sentidos

Total project amount

612,77 thousand €

Amount paid

61,28 thousand €

Non-refundable funding

612,77 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

04/C03-i06.03/2023.P7791

Summary

Este projeto pretende revitalizar um conjunto de edificado degradado e colocá-lo ao serviço da comunidade em geral, permitindo um trabalho técnico direcionado para públicos específicos (crianças e idosos) através da exploração dos 5 sentidos. Em concreto: 1) VISÃO: requalificação do edifício do Sindicato dos Vidreiros do Norte de Portugal, em Bustelo, Freguesia de São Roque – dotar-se-á este espaço de condições para realização de exposições de fotos do passado e do presente; importância do registo/espólio fotográfico na perpetuação de memórias e da identidade; realização de exposições, workshops e cursos de fotografia/ filmes / digital 2) PALADAR: Requalificação da Escola Cantina, em S. Martinho da Gândara – posicionar-se-á este espaço como centro de confluência de sabores tradicionais e contemporâneos/alta cozinha; ensino da confeção de gastronomia do passado e do presente com cursos de culinária intergeracionais; importância da alimentação saudável; realização de mostras gastronómicas e eventos de showcooking. 3) OLFATO: Requalificação do Polo de Inovação de Cultura, em Macinhata da Seixa – pretende criar-se um espaço de lazer e criação de polo intergeracional na casa de pedra abandonada; criação de jardim dos sentidos com ervas/plantas aromáticas e concisos apontamentos de interpretação da Flora presente. O Projeto “Viagem pelo mundo dos sentidos” alcança o pleno através complementaridade com as Operações “103 - Gerações” - onde serão reproduzidos sons (AUDIÇÃO) emitidos pela natureza, que transportam para um dos cenários privilegiados dos livros do autor oliveirense Ferreira de Castro – e “100 - Acolher com Afeto” – com a inclusão de pequenas hortas comunitárias, onde os residentes e a comunidade das mais abrangentes faixas etárias podem contactar (TATO) com a terra, trabalhando-a.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,8
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

612,77 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 10 %,

Where was the money spent

By county

1 county financed .

  • Oliveira de Azeméis 612,77 thousand € ,
Source AD&C, EMRP
11.09.2024