Jump to main page content
Loading...

Project sheet

Name

Social Hub - 2ª Fase

Total project amount

592,4 thousand €

Amount paid

0 €

Non-refundable funding

592,4 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

04/C03-i06.03/2023.P7766

Summary

A operação supraconcelhia Social Hub consiste na criação de soluções inovadoras para a comunidade, e em particular, para os grupos desfavorecidos. Nesta fase serão apresentadas as seguintes ações: • Centro de Inclusão Social 2.0 – a implementar pelo Município de Vila Nova de Gaia, prevê diferentes intervenções com públicos distintos, mas com especial enfoque na população em especial situação de vulnerabilidade, seja por questões sociais, financeiras, educativas ou de saúde. • HUB Villa Manuela - ação de cariz infraestrutural, a desenvolver pelo Município de Espinho. O projeto “HUB Villa Manuella”, enquanto centro de experimentação em inovação social, visa contribuir para a construção de um ecossistema de inovação, criatividade, sustentabilidade e empreendedorismo, onde o desenvolvimento e partilha do conhecimento, e o recurso a metodologias de participação cívica, permitam por um lado, fomentar o desenvolvimento da inovação social e dos outputs associados, e por outro lado, valorizar a identidade de Espinho, trazendo a experiência do passado para um contexto social que impõe desafios em diversos setores. Propõe-se a localização do projeto, num edifício emblemático, localizado no centro da cidade de Espinho – Villa Manuella, datada de 1927 e adquirida pelo Município em 1991. Trata-se de projeto integrado, que inclui a regeneração do edificado, associada à preservação e ao processo de reabilitação do espaço público, atualmente em curso, com a Rearborização do Espaço Envolvente à Villa Manuella, no Prolongamento do Parque João de Deus e a construção de um Circuito de Manutenção, a executar no âmbito da operação – Espaços Intergeracionais do PAOITI, que representa uma processo que se pretende inovador e sustentável e que preserve a herança e os valores histórico locais. No âmbito da implementação do projeto, durante a fase de Reabilitação da Villa Manuella, propõe-se que o projeto fique alojado temporariamente no Centro Multimeios, um espaço igualmente de inovação, de geração de conhecimento e de criatividade, na proximidade da Biblioteca Municipal e que integra o planetário, um Observatório Astronómico, cinema e galeria de exposições, entre outos espaços de partilha, de cultura e de criatividade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

592,4 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Nova de Gaia 592,4 thousand € ,
Source AD&C, EMRP
11.09.2024