Project sheet

Name

Cidades Integradoras - 3ª fase

Total project amount

1,18 million €

Amount paid

0 €

Non-refundable funding

1,18 million €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

04/C03-i06.03/2023.P7739

Summary

A operação supraconcelhia “Cidades Integradoras”, pretende contribuir para uma maior inclusão das comunidades desfavorecidas dos concelhos de Vila Nova de Gaia e de Espinho, nomeadamente residentes do Parque Habitacional Social, desempregados de longa duração, população empregada em situação de precariedade ou subemprego, crianças e jovens em risco e população idosa em situação de isolamento e exclusão social. Nesta fase de submissão de candidaturas é apresentada a ação denominada “Bairro 2030 +i” desenvolvida pela empresa Gaiurb, em conjunto com o Município de Vila Nova de Gaia. Esta ação visa criar soluções de respostas articuladas e integradas respondendo a desafios ambientais, urbanísticos, de saúde e segurança, das qualificações e das competências, culturais, digitais e integradoras de uma nova geração de equipamentos adequadas às novas problemáticas e respostas sociais indutoras de soluções e abordagens transformadoras, logo inovadoras. Todas as atividades propostas nesta ação visam a redução da pobreza e da exclusão, a promoção da saúde, o bem-estar e qualidade de vida da população, bem como a valorização e ampliação das competências e o aumento de resiliência das comunidades, a promoção e qualificação dos recursos e as parcerias institucionais para a inclusão e a inovação social. Assim, de modo a dar resposta a situações sociais críticas esta ação baseia-se na definição de quatro grandes áreas de intervenção: 1) Educação; 2) Saúde e Desporto; 3) Intervenção Comunitária e 4) Empregabilidade e Capacitação.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,18 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Nova de Gaia 1,18 million € ,
Source AD&C, EMRP
11.09.2024