Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Acessibilidades 360.º - Castelo da Lousã

Total project amount

5,08 thousand €

Amount paid

1,52 thousand €

Non-refundable funding

5,08 thousand €

Loan funding

0 €

Start date

01.02.2024

Expected end date

30.03.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P8121

Summary

O complexo está dotado de percurso acessível ao Castelo e ao estacionamento, por via de um percurso ora de nível ora rampeado.Necessita, no entanto, de uma instalação sanitária de uso comum de géneros e para pessoas com mobilidade condicionada. Tendo em conta o espaço verde onde está inserido optou-se pela colocação de uma estrutura modelar enquadrada esteticamente na paisagem. O local escolhido para a sua colocação cumpre as regras da Zona de Proteção dos Monumentos Nacionais, sendo afastado no Castelo, mas mesmo assim acessível. Assim o presente projeto visa a promoção da acessibilidade para pessoas com mobilidade condicionada no acesso aos serviços públicos, nomeadamente ao Castelo da Lousã, mediante a aplicação do Decreto-Lei n.º 163/2006, de 8 de agosto, na sua redação atual e respetivas Normas Técnicas de Acessibilidade (NTA).Os resultados a atingir com as intervenções a realizar são:a) m² de área da obra – 4,84b) m² de área acessível – 4,84As ações a realizar são:1. Instalação de estrutura modelar de IS;2. Trabalhos de canalização necessários para sistema de drenagem e abastecimento das águas. O investimento total orçamentado será de 9 464,35€ ao qual acresce IVA à taxa legal, sendo apenas elegível o valor de 5 075,20€, desagregado da seguinte forma:Descrição Investimento Investimento apoiado NTAInstalação Sanitária IT :8 164,35€ IE 3.775,20€ NTA C2|S2.9Trabalhos de Canalização imprescindíveis à instalação IT: 1.300,00€ IE:1.300,00€ NTA: Trabalhos imprescindíveis e associadosO diferencial do valor elegível proposto para o investimento total será suportado pelo Município da Lousã. Em termos de execução física prevê-se que o início da operação seja 01/02/2024 e que o seu término seja 30/03/2024.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

5,08 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Lousã 5,08 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading