PRR Project

Melhoria de Acessibilidades Exteriores a Pessoas com Mobilidade Reduzida no Edifício dos Paços do Concelho - Rampa de

Project sheet

Name

Melhoria de Acessibilidades Exteriores a Pessoas com Mobilidade Reduzida no Edifício dos Paços do Concelho - Rampa de

Total project amount

10,06 thousand €

Amount paid

3,02 thousand €

Non-refundable funding

10,06 thousand €

Loan funding

0 €

Start date

01.04.2024

Expected end date

30.04.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P8060

Summary

O principal objetivo desta intervenção é melhorar a acessibilidade ao Edifício dos Paços do Concelho, proporcionando a todos os munícipes a utilização das instalações de forma independente. A promoção da acessibilidade encontra nesta fase a oportunidade eliminar barreiras arquitetónicas, para implementar soluções de conceção e intervenção no espaço público e construído que garantam os princípios de inclusão, funcionalidade e melhor qualidade de vida para todos os cidadãos, promovendo a igualdade de oportunidades para todos.A proposta consiste na demolição da rampa existente, construindo um novo acesso de acordo com as normas de segurança e padrões de acessibilidade, assegurando a sua conformidade com a legislação em vigor.Os trabalhos, preveem a remoção das lajetas e muretes da rampa existente, para o seu posterior reaproveitamento, escavação para implantação do prolongamento da nova rampa de acesso ao edifício, no cumprimento das inclinações máximas exigidas na legislação vigente. Na construção do novo acesso serão utilizadas pedras de granito idênticas ao existente e de acordo com a arquitetura do edifício, com a aplicação de guardas e corrimão em aço para proteção.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

55,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

10,06 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vila Nova de Paiva 10,06 thousand € ,
Source EMRP