PRR Project
Melhoria das Acessibilidades nos Edifícios Municipais (Piscinas Municipais)
Project sheet
Name
Melhoria das Acessibilidades nos Edifícios Municipais (Piscinas Municipais)Total project amount
10 thousand €Amount paid
3 thousand €Non-refundable funding
10 thousand €Loan funding
0 €Start date
01.02.2024Expected end date
30.04.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
04/C03-i02/2023.P5945Summary
É um elevador motorizado e portátil, equipado com uma barra de tração automática para reduzir o esforço do operador. Movimentos motorizados de 2 velocidades; Barra de controlo do movimento para a frente e do assento; Chave de arranque; Indicador do nível de carga da bateria; Botão de paragem de emergência; Sistema anti esmagamento para o movimento para trás; Sistema de travagem automática integrado na roda motorizada; Caixa electro-hidráulica; Bomba manual de emergência para utilização em caso de falha de energia; Batentes de borracha dianteiros para bloqueio de segurança para a frente; Sensor de infravermelhos do orifício frontal para paragem de segurança para a frente; Apoio de pernas retrátil; Apoios de braços ajustáveis; Carregador de bateria interno com indicador LED; cinto de segurança de 5 pontos; Galvanização e revestimento a pó; Curso máximo: 1385 mm; Profundidade do assento dentro de água: 775 mm; Tempo de descida- elevação com peso na água: 20 seg Bateria: 24 V.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
10 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Valpaços 10 thousand € ,