Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Acessibilidade 360º - Casa dos Magistrados

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

15.01.2024

Expected end date

29.11.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P5932

Summary

A primeira ação tomada em torno deste Programa consistiu em identificar os obstáculos à circulação, identificados abaixo, e selecionar aquelas que carecem de intervenção ao nível de melhoria das acessibilidades.Sendo a edificação em causa um edifício público existente são de salientar os seguintes aspetos:- A entrada de um dos portões de acesso privado ao espaço exterior do edifício está regulamentar quanto à sua soleira e quanto à largura do mesmo. (cumpre)- A largura do percurso interior até à zona onde vai ser localizada a plataforma elevatória é regulamentar. (cumpre)- A rampa de acesso à porta de entrada localizada na lateral do edifício não é regulamentar quanto à sua inclinação. (não cumpre)- A largura da porta de entrada da lateral do edifício é regulamentar. (cumpre)- No piso 0 existem espaços de manobra e largura de corredores regulamentares. (cumpre)- Existe uma instalação sanitária dirigida a pessoas com mobilidade reduzida equipada e com dimensões regulamentares. (cumpre)A realização do respetivo projeto para esta proposta é acompanhada por elementos gráficos, constituídos pelas diversas plantas de arquitetura, e, por elementos escritos, compreendendo a memória descritiva e justificativa do projeto, bem como pelo orçamento estimado para as operações e o respetivo cronograma físico e financeiro.Apresenta-se, nesta candidatura, um projeto que visa corrigir as anomalias identificadas na habitação e já mencionadas acima, através de uma intervenção estruturada, que visa executar as seguintes ações: - Implantação de plataforma elevatória exterior para aceder ao 1º Piso deste edifício.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Arouca 13 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading