Name

Acessibilidades do Posto de Turismo da Lourinhã

Total project amount

5,13 thousand €

Amount paid

1,54 thousand €

Non-refundable funding

5,13 thousand €

Loan funding

0 €

Start date

28.10.2020

Expected end date

26.12.2020

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P5690

Summary

No âmbito desta candidatura e tendo a dotação do PRR alocada a este aviso por imóvel no valor de 13 mil euros que se pretende distribuir na realização de trabalhos da empreitada de obras públicas a qual pretende assegurar as condições de acessibilidade a todos os utilizadores do serviço público prestado pelo posto de turismo estão inseridas as seguintes ações: alteração das caixilharias existentes, estando prevista a sua substituição por vãos envidraçados; alteração da localização do acesso ao espaço destinado ao Posto de Turismo, passando a nova entrada a ser feita pela lateral (zona mais favorável) através da criação de uma rampa, sita na Avenida António José de Almeida nº1, por forma a cumprir a lei das acessibilidades em suprimento das escadas existentes no local; criação de uma antecâmara envidraçada, que servirá de resguardo ao interior do posto; no alçado frontal (entrada existente), eliminação dos degraus existentes, por forma a dar continuidade da fachada nessa zona, com revestimento igual ao existente na restante fachada; substituição do revestimento do pavimento e respetivo rodapé; trabalhos de pinturas diversos de paredes e teto; melhoramento da rede elétrica e de telecomunicações, assim como instalação de sistema de deteção de incendio

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

55,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

5,13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Lourinhã 5,13 thousand € ,
Source EMRP