Name

Execução de Acesso à Casa Municipal da Cultura

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

24.09.2024

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P5511

Summary

As ações e investimento do projeto, são:Secção 2.5 – Rampas - a intervenção proposta visa a demolição de parte da escadaria que se localiza na zona exterior lateral do edifício, para criação de uma rampa de acesso a uma entrada secundária que se localiza nesta zona do edifício. A rampa proposta terá uma inclinação de 8 %, com uma projeção horizontal de 9,00 m, para vencer um desnível de 0,72 m. Será constituída por dois lanços, cada um com uma projeção horizontal de 4,50 m e largura útil, medida entre corrimãos, de 1,30 m, e por uma plataforma horizontal de descanso entre os dois lanços e que corresponde ao local onde é efetuada uma mudança de direção com um ângulo de 90º, com largura e comprimento de 1,50 m. Corrimão e barras de apoio - A intervenção proposta consiste na colocação de dois corrimãos laterais, bem como de um duplo corrimão central, considerando que a escadaria tem uma largura superior a 6,00 m, cumprindo com o disposto na alínea 3) do ponto 1.3.1 da secção 1.3 do Anexo do Decreto-Lei n.º 163/2006, de 8 de agosto, na sua atual redação, ainda que a escadaria se encontre localizada no interior do prédio e não na via pública.Secção 2.8 - Espaços para estacionamento de viaturas - A proposta de intervenção contempla a criação de um lugar de estacionamento reservado para pessoas com mobilidade condicionada, localizados nas imediações da escadaria e da rampa de acesso à entrada secundária da casa municipal da cultura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Alvaiázere 13 thousand € ,
Source EMRP