PRR Project

Melhoria das Condições de Acessibilidades ao auditório e zona de conferências através do acesso autónomo a partir

Project sheet

Name

Melhoria das Condições de Acessibilidades ao auditório e zona de conferências através do acesso autónomo a partir

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

14.01.2025

Expected end date

20.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4933

Summary

A intervenção a efetuar tem como objetivo a melhoria da acessibilidade ao auditório do edifício, dotando-o de um acesso a partir do exterior que permita cumprir o disposto no 1.1.5 do capítulo 1 da NTA.Para tal propõe-se:• A construção de uma rampa de acesso ao patamar de arranque da escada. Esta desenvolve-se a toda a largura deste patamar, a partir do passeio e terá 1.60 m de comprimento para um desnível de cerca de 16 cm. Enquadrando-se no n.º 2.5.2 alínea 1 das NTA.• A instalação de uma plataforma elevatória rebatível sobre as escadas de acesso ao piso -1 a partir do exterior, em conformidade com o disposto na secção 2.7 das NTA.• A instalação de um corrimão central, duplo e de um corrimão lateral, já que as escadas têm 3.55 m de largura, para cumprimento da alínea 3 do n.º 1.3.1 das NTA.Considerando para o cálculo do montante de investimento do projeto os valores unitários máximos de financiamento (sem IVA incluído) para cada tipologia de intervenção elegível enunciados no capítulo 4.1 (Intervenções elegíveis) do aviso n.º 04/C03-i02/2023 a intervenção global terá um valor máximo estimado de investimento com a seguinte estrutura de custos (valores sem IVA incluído):- Rampa de acesso ao patamar de arranque da escada - 4.742,40€. Plataforma elevatória - 15 236,00€- Corrimão - 3 120,00€O valor global da intervenção encontra-se estimada em 23.098,40 € (sem Iva incluído) e 28 411,03 € (com IVA a 23% incluído), considerando uma comparticipação do PRR equivalente a 13.000,00€ e 15 411,03€ de investimento do IPDJ, I.P..

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Portalegre 13 thousand € ,
Source EMRP