Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

EB, 2, 3 / S - Bloco 4 - Acessibilidades 360º - Arcos de Valdevez

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

03.06.2024

Expected end date

06.09.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4900

Summary

O projeto “E. B. 2, 3 / - BLOCO 4 - ACESSIBILIDADE 360º - ARCOS DE VALDEVEZ" compreende uma área de intervenção de cerca de 1.940,90 m2, na frente ribeirinha da margem direita do rio vez, na zona da Lamela.Este projeto escontra-se situado numa das a mais importante parte do centro urbano da vila onde estão localizados diversos edifícios de habitação, serviços, comércios e vários equipamentos públicos desportivos, transporte e proteção civil, assim como, e diversos espaços verdes de lazer e de utilização pública. Este procurou-se ainda, privilegiar a ligação entre os principais polos de circulação pedonal no centro da vila, procurando regenerar, nas áreas de intervenção, as atividades económicas e sociais.O edifício a considerado no presente Plano, denominado de EB 2-3 S-Bloco 4 é propriedade do município de arcos de Valdevez, encontra-se implantado na Rua Doutor Joaquim Carlos da Cunha Cerqueira, UF de Arcos Salvador, Vila Fonche e Parada. O piso Bloco 4 incorpora diversas unidades como salas de aula e de música, educação visual. cantina, buffet e sala de convívio, destinadas ao ensino básico dos 2° e 3°s ciclos e ensino secundário. As instalações sanitárias de uso geral, encontram-se dimensionadas para utilização por parte de pessoas com mobilidade condicionada -Secção 2.9. Uma vez que estamos perante um edifício que foi alvo de intervenções e dotado de parte de acessibilidades, no entanto tornou-se necessário do ponto de vista funcional que no lanço de escadas, de ligação interior entre os dois pisos, seja instalada urna plataforma elevatória que permitirá, em caso de necessidade, a sua utilização por parte de pessoas com mobilidade condicionada, sem comprometer a sua autonomia, nos termos do disposto na Secção 2.7. Todas as circulações comuns e acesso encontram-se em toda a sua extensão desimpedidas de qualquer obstáculo, em conformidade e nos termos do disposto no Capitulo 4, nomeadamente, o tipo de revestimento dos pavimentos dos pisos que integram o percurso acessível, conformam-se com as disposições da Secção 4.7 e 4.8. As peças desenhadas complementam a presente memória descritiva. Importa referir que nas escadas no piso superior localizadas no corredor que liga as duas alas do edificio, junto à sala de música, que encontra-se identifica nas peças desenhadas na cor amarelo.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Arcos de Valdevez 13 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading