PRR Project
Casa do Bispo - Intervenção no Edifício para melhoria das Acessibilidades
Project sheet
Name
Casa do Bispo - Intervenção no Edifício para melhoria das AcessibilidadesTotal project amount
13 thousand €Amount paid
13 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
01.08.2022Expected end date
27.10.2025Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
04/C03-i02/2023.P4869Summary
1. C2|S2.7 Plataformas elevatórias O edifício da Casa do Bispo é composto por dois pisos, acima da cota de soleira. Desde a via pública, é possível definir um percurso acessível até ao seu interior. A entrada principal encontra-se no grande pátio exterior, com uma diferença de +0,02cm de cota, cumprindo as NTA. O primeiro espaço é o átrio principal e é onde está localizado o equipamento da plataforma elevatória. A plataforma elevatória, integra o plano de acessibilidades e cumpre com o disposto na seção 2.6 das NTA pois, apesar de tecnicamente ser considerada plataforma, assume-se como um ascensor, no que diz respeito as suas características físicas. Insere-se dentro do percurso acessível da Casa do Bispo, que liga os espaços exteriores e o interior do edifício, através de uma entrada acessível ao local da intervenção.A partir da mesma é possível aceder ao 1º piso do edifício da Casa do Bispo sem constrangimentos e a todos os seus espaços, que incluem maioritariamente, os gabinetes da presidência e secretariado.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Coimbra 13 thousand € ,