Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Acessibilidades 360.º - Biblioteca Municipal Comendador Montenegro

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.01.2024

Expected end date

30.06.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4852

Summary

As ações no WC do Rés-do-Chão da biblioteca, enquadram-se tipologias do aviso, nomeadamente no C2 seção 2.9. Instalações Sanitárias e 4.2.2 Trabalhos imprescindíveis associados a intervenções elegíveis e consistem em:• Demolição de alvenarias interiores do edifício,• Remoção do revestimento do pavimento existente e rodapés,• para aplicação do novo revestimento,• Execução de roços em paredes,• Trabalhos em Alvenarias e Cantarias,• Revestimento de tetos, paredes e pavimentos interiores,• Carpintarias em portas e armários,• Pinturas,• Instalação de louças, equipamentos sanitários, toneiras, barras de apoio, espelhos, entre outros,• Melhoria da iluminação,• Sistema de alarme de WC,• Respetivos trabalhos de águas, esgotos, eletricidade, ITED.O investimento total orçamentado para a obra será de 15.76,35€ (sem IVA), sendo o investimento elegível de 13.000,00€, o remanescente será suportado pelo orçamento municipal.Em termos de execução física e financeira, inicia a 01/01/2024 e termina a 30/06/2024. Não obstante este investimento, em articulação com as entidades locais, ARCIL e Agrupamento de Escolas, prevê-se a aquisição de equipamentos e meios de apoio para a facilitação da visita de grupos, de modo a disponibilizar um programa com ocupações construtivas e com controlo da estimulação proveniente do ambiente. Os investimentos e programa previstos neste parágrafo não constam da presente candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Lousã 13 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading