Name

Promoção de Acessibilidades no Teatro Viriato (Viseu)

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.03.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4808

Summary

Pretende o Município de Viseu proceder à requalificação/adaptação, no interior do Viriato Teatro Municipal, de três instalações sanitárias existentes.Pretende-se também instalar duas plataformas de escada, de modo a que todo o edifício fique acessível a P.M.C., quer a zona de entrada/saída que recebe público, as circulações verticais percorridas pelo público e a zona de entrada/saída de artistas e colaboradores. A primeira plataforma será instalada na escadaria principal do edifício.A segunda plataforma será instalada na escada de serviço existente no tardoz do edifício, cota -3,50. A operacionalidade desta plataforma, atendendo ao espaço físico atualmente existente e só este será utilizado, (não sendo possível outras obras de adaptação de construção civil neste local, para além do alteamento da parede referida), é viabilizada pela proximidade da portaria na qual está presente um vigilante sempre que o teatro está em funcionamento. A ação deste vigilante (com visibilidade direta para o exterior através de janela existente) é fundamental para a perfeita operacionalidade da plataforma, procedendo este manualmente, à abertura para o exterior das portas existentes nesta entrada de serviço, de modo a não existirem conflitos de movimentos entre as portas e o movimento da plataforma na chegada da mesma ao patamar.No movimento de subida o procedimento inverte-se, sendo as portas referidas fechadas pelo vigilante.O elevador existente permitirá, como já permite atualmente, a acessibilidade aos restantes espaços do edifício.A eliminação de barreiras arquitectónicas e a criação/melhoria das acessibilidades foram as diretrizes orientadoras do projecto

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Viseu 13 thousand € ,
Source EMRP