Project sheet

Name

Edifício de Apoio ao Cemitério de Santo Onofre

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

08.09.2025

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4733

Summary

Entende-se a acessibilidade como um serviço público integrado, que deve atravessar todos os setores de atividade das instituições e implicar o empenho de todos. Estamos a trabalhar para que o serviço público oferecido seja cada vez mais acessível a um maior número de utentes, independentemente da sua condição social, cultural, económica ou estado de saúde (deficiência ou incapacidade).Neste sentido o Município das Caldas da Rainha procedeu à análise e diagnóstico de um conjunto de edifícios públicos municipais, através de visitas e análise de campo, do que resultou um conjunto de propostas de intervenções de forma a melhorar as condições de acessibilidade a pessoas com mobilidade reduzida.A nível exterior, a intervenção no Edifício de Apoio ao Cemitério de Santo Onofre, consiste na marcação no pavimento de dois lugares de estacionamento exclusivos para utilização por veículos em que pelo menos um dos ocupantes tenha mobilidade condicionada, pavimento rampeado e sinalização vertical, percurso pedonal táctil entre os lugares de estacionamento e a entrada do cemitério. A nível interior, no edifício de apoio ao campo, as instalações sanitárias adaptadas serão apetrechadas de um alarme adequado, ligado ao sistema de alerta (luminoso e sonoro) para o exterior e será colocado um cabide rebaixado.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Caldas da Rainha 13 thousand € ,
Source EMRP
10.02.2026