PRR Project
Melhoria de Acessibilidades do Parque Desportivo Municipal de São Jorge
Project sheet
Name
Melhoria de Acessibilidades do Parque Desportivo Municipal de São JorgeTotal project amount
13 thousand €Amount paid
3,9 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
01.05.2024Expected end date
30.09.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
04/C03-i02/2023.P4654Summary
A presente intervenção consiste na resolução de obstáculos de acessibilidade no Parque desportivo Municipal de São Jorge.Assim, a intervenção centra-se nos seguintes pontos:1. Pavimentação de parte superior de bancadas para criação de lugares para PMCA parte de cima das bancadas não é pavimentada, permite a circulação por todas as pessoas, mas impedindo as PMC de assistir às atividades desportivas. A intervenção prevê a pavimentação do percurso acessível com betonilha esquartelada, que é um pavimento contínuo não escorregadios, reflectores ou com texturas irregulares, é durável e não é desgastável pela acção da chuva ou de lavagens frequentes, conforme a norma técnica. [4.7.1]Segundo a NTA [3.6.1] para uma capacidade de 101 e 200 lugares devem ser previstos quatro lugares e os mesmos devem ser distribuídos por vários pontos da sala. [3.6.2] Assim, estamos a propor a colocação de dois lugares em cada lado no fim do percurso. A razão de localização dos lugares nestes pontos prende-se com a visibilidade da PMC, uma vez que estas áreas não costumam estar lotadas permitindo uma melhor visibilidade e conforto.Os lugares para PMC são contíguos ao percurso acessível e serão marcados no pavimento e localizam-se numa área de piso horizontal e possuem uma dimensão não inferior a 0,8 m por 1,2 m e tem uma margem livre de 0,3 m à frente e atrás da zona livre para a permanência.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Penela 13 thousand € ,