Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

ESCOLA 1º CEB DE TONDELINHA – INSTALAÇÃO DE ELEVADOR/ACESSIBILIDAES

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

03.10.2024

Expected end date

31.03.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4627

Summary

Pretende-se com a instalação de um elevador no edifício da Escola do 1º CEB de Tondelinha de Orgens, na freguesia de Orgens, na Rua da Escola, 3510-694 Viseu, 40°38´57.69"N - 7°57´3.40"W, equipar este edifício escolar com um equipamento mecânico de deslocação vertical – elevador, que permita o acesso aos três níveis do edifício (nível -1 Logradouro, nível 0 entrada principal e nível 1 andar), por parte dos professores, alunos e pessoal auxiliar, tendo em especial atenção a mobilidade das Pessoas com Mobilidade Condicionada – P.M.C., nomeadamente e em particular os alunos com diversos graus de condicionamentos físicos e cognitivos que frequentam esta escola, na grande maioria das utilizações do equipamento terão que ser obrigatoriamente acompanhados por uma auxiliar ou professor(a) na sua deslocação, respeitando toda a legislação atualmente em vigor sobre eliminação de barreiras arquitetónicas e acessibilidades,nomeadamente o Decreto-Lei n.º 163 de 08 de Agosto de 2006 e ainda o Decreto-Lei n.º 125/2017, de 4 de Outubro, bem como a legislação específica para ofornecimento, colocação e utilização de elevadores, ( disjuntor diferencial classe B aplicado no Q.E. que alimenta o quadro do ascensor ) incluindo a certificação de acordo com a legislação em vigor, e dispositivo de chamada em caso de incêndio – art.º 103 da Portaria n.º 1532/2008 de 29 de dezembro.Nota importante, o equipamento a instalar deverá prever a capacidade para 8 (oito) pessoas (superior aos mínimos exigidos na lei ) de modo a proporcionar,facilidade, comodidade e eficiência de utilização para o utilizador condicionado simultaneamente com o necessário acompanhante/auxiliar de apoio, respeitando na íntegra a legislação (Decreto-Lei n.º 163 de 08 de Agosto de 2006 ) acima referida, nomeadamente a Secção 2.6 - Ascensores (Decreto-Lei n.º 163 de 08 de Agosto de 2006).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Viseu 13 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading