Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Acessibilidade Edifício sede da Junta de Freguesia de Carregal do Sal

Total project amount

13 thousand €

Amount paid

13 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.03.2024

Expected end date

29.10.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4566

Summary

A acção que se pretende colocar em prática neste caso, enquadra-se na listagem de intervenções elegíveis no âmbito das NTA, tratando-se da instalação de um ascensor. O equipamento previsto (e do qual se anexa respectiva ficha técnica) respeita todos os pressupostos da Secção 2.6 do capítulo 2.Esta revelou ser a solução menos invasiva na orgânica arquitectónica e funcional deste edifício, onde operam 2 serviços públicos (Julgado de Paz no piso 0 e Junta de Freguesia no piso 1). O ascensor á acessível pelas zonas de circulação e ocuparam parte de espaços de arrumos que actualmente se encontram subaproveitadas.Com esta solução não introduzimos qualquer elemento disrupto que seja dissonante e prejudicial na preservação das características formais e arquitectónicas da escada e do hall deste edifício.Os trabalhos prévios de demolição / reparação de paredes necessários para a viabilidade da instalação deste equipamento, serão levados a cabo pelos serviços internos do Município, uma vez que o valor de mercado para este tipo de equipamento já extrapola o valor máximo da comparticipação deste aviso.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Carregal do Sal 13 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading