Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Aquisição de Elevador de Piscina Portátil para as Piscinas Municipais

Total project amount

9 thousand €

Amount paid

2,7 thousand €

Non-refundable funding

9 thousand €

Loan funding

0 €

Start date

01.03.2024

Expected end date

31.03.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4460

Summary

Foi elaborado um estudo para a aquisição e instalação de um elevador de piscina portátil para as piscinas municipais estando previstas ou foram já efetuadas as seguintes ações:Foi efetuada uma pesquisa por diferentes fabricantes e fornecedores de elevadores de piscina portáteis para identificar opções que atendam às necessidades específicas das piscinas municipais, nomeadamente no que concerne às características técnicas, capacidade de peso, durabilidade e facilidade de operação dos diferentes modelos disponíveis.Foi também definido um orçamento para aquisição e instalação do elevador, considerando não apenas o custo inicial, mas também os custos de manutenção a longo prazo.Com base na pesquisa feita, foi selecionado o modelo de elevador de piscina portátil que melhor atenda às necessidades da nossa piscina municipal.Também houve uma preocupação por parte dos serviços relativamente à instalação, que deverá ser feita por profissionais qualificados e em relação à formação por parte dos funcionários que irão manusear o Elevador de Piscina Portátil.Está também a ser preparada uma ação de divulgação e promoção para todos os utilizadores da piscina e munícipes acerca da aquisição do elevador portátil e da forma como as pessoas com mobilidade reduzida irão tirar partido dele.Irá também ser implementado um plano de manutenção regular para garantir que o elevador de piscina portátil esteja sempre em boas condições de funcionamento e irá ser dada formação a um técnico para que realize verificações regulares de segurança e manutenção de rotina.Regularmente irá ser avaliado o uso e a eficácia do elevador, através do feedback de quem dele usufrui havendo os necessários ajustes se for o caso.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

50,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

9 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vila Nova de Paiva 9 thousand € ,
Source EMRP
10.02.2026
All themes
Transparency without leading