PRR Project
Pinto Brasil | ResilientPowerGrid
Project sheet
Name
Pinto Brasil | ResilientPowerGridTotal project amount
178,77 thousand €Amount paid
41,12 thousand €Non-refundable funding
178,77 thousand €Loan funding
0 €Start date
01.05.2023Expected end date
31.12.2023Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P4916Summary
O Grupo Pinto Brasil, onde se inclui a Pinto Brasil, tem vindo a adoptar acções para mitigar o impacto ambiental decorrente da sua actividade. Neste sentido, pretende-se com este projecto dotar a Pinto Brasil de uma UPAC - energia solar, capaz de lhe proporcionar cerca de 49% de auto-suficiência eléctrica, contribuindo, deste modo, para (i) reduzir substancialmente a sua dependência energética face a terceiros e (ii) contribuir activamente para as metas do PNEC2030 e para um futuro da indústria neutro em carbono.Assim, o projecto ResilientPowerGrid propõe a instalação de um sistema fotovoltaico com 11 inversores e 882 módulos numa área de 2.342m2, que resultará numa potência estimada instalada de 463,05kW. Esta prioridade estratégica pressupõe uma alteração de paradigma das fontes que alimentam a sua unidade fabril, com impacto previsível nos seguintes indicadores:i. Redução de emissão de GEE de 78.4 ton CO2/ano (28%);ii. Poupança no consumo de electricidade de 426.06 MWh/ano (30%).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
178,77 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 23 %,Where was the money spent
By county
1 county financed .
-
Guimarães 178,77 thousand € ,