PRR Project
Sustentabilidade Ambiental e Energética da DISPLAX através do investimento em UPAC de 61 KWp
Project sheet
Name
Sustentabilidade Ambiental e Energética da DISPLAX através do investimento em UPAC de 61 KWpTotal project amount
30 thousand €Amount paid
6,9 thousand €Non-refundable funding
30 thousand €Loan funding
0 €Start date
30.12.2021Expected end date
31.12.2025Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P3527Summary
Projeto de investimento para aquisição e instalação de uma UPAC (Unidade de Produção de energia elétrica para AutoConsumo) de 61 KWp nas instalações industriais da DISPLAX, a partir de fontes de energia renováveis, sob forma de uma central fotovoltaica (energia solar), tendo por objetivos: i) a transição climática, reduzindo a aquisição de energia elétrica à rede e, portanto, reduzindo a pegada carbónica (emissão de GEE ? Gases com Efeito de Estufa) da empresa; ii) a produção de energia elétrica para consumo próprio, fazendo diminuir deste modo a quantidade de energia restante necessária que tem de ser adquirida à rede elétrica (aquisição externa); iii) e, consequentemente, reduzindo custos da energia elétrica requerida e paga à rede elétrica; iv) minimização das falhas de energia diurnas que possam ocorrer e perturbar a laboração industrial da empresa; v) evitar a flutuação do mercado no que se refere ao custo da energia elétrica adquirida à rede elétrica.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
30 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 23 %,Where was the money spent
By county
1 county financed .
-
Braga 30 thousand € ,