PRR Project

Ampliação da Rede de Abastecimento de Água e Eliminação da Rede Existente de Fontanários nas Localidades do Zimbra

Project sheet

Name

Ampliação da Rede de Abastecimento de Água e Eliminação da Rede Existente de Fontanários nas Localidades do Zimbra

Total project amount

380,78 thousand €

Amount paid

0 €

Non-refundable funding

380,78 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.03.2026

Dimension

Resilience

Component

Water management

Investment

Algarve Regional Water Efficiency Plan

Operation code

03/C09-i01.01/2023.P4783

Summary

Com a substituição das condutas e com a implementação de ramais individuais, passamos a obter ganhos com a intervenção, além de se recuperar pelo consumo também se recupera em durabilidade, prolongando o tempo de vida útil das condutas, contribuindo para a garantia da qualidade da água fornecida e consequentemente reduzir as perdas reais pela boa execução do projeto. A CM Loulé procura com esta candidatura reforçar a estratégia integrada de monitorização e redução de perdas de água, que conduz não só a ganhos de eficiência operacional, financeira, saúde pública, social e ambiental, como tende a constituir-se como um fator de continuidade na mudança no comportamento da própria edilidade na redução das perdas, através de medidas que visam uma postura proactiva e sustentável dos serviços de abastecimento de água.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

380,78 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Loulé 380,78 thousand € ,
Source AD&C, EMRP
18.09.2024