PRR Project

Reabilitação de rede pública de abastecimento de água na Urbanização Quintas e Monteiro no Cerro de São Miguel -

Project sheet

Name

Reabilitação de rede pública de abastecimento de água na Urbanização Quintas e Monteiro no Cerro de São Miguel -

Total project amount

150,47 thousand €

Amount paid

0 €

Non-refundable funding

150,47 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.03.2026

Dimension

Resilience

Component

Water management

Investment

Algarve Regional Water Efficiency Plan

Operation code

03/C09-i01.01/2023.P4721

Summary

Pretende-se com esta operação, a reabilitação de rede pública de abastecimento de água na Urbanização Quintas e Monteiro no Cerro de São Miguel, Silves, localizada na Freguesia de Silves, parte integrante do Subsistema de Silves. A rede existente na urbanização é em PVC com diâmetro de 110mm a 63mm, instalada em 1983. A rede encontra-se em mau estado de conservação o que é comprovado pelo histórico de roturas. Tendo em consideração o elevado número de roturas, esta operação está identificada como prioritária. A operação prevê a substituição de condutas em PVC existentes, por novas condutas em PVC, com 1350 m de PVC DN110, 24 m de PVC DN160 e 12 m de PVC DN200 e substituição de 73 ramais. A operação prevê a instalação de hidrantes para combate a incêndio e todos os acessórios necessários à operação da rede. A operação é, portanto, de vital importância para o Subsistema de Silves, com impacto relevante na qualidade de serviço prestada aos clientes residentes na Urbanização Quinta e Monteiro. A não implementação da operação poderá colocar em causa o normal fornecimento de água à Urbanização. Nas condutas a substituir, estima-se uma perda real anual de água no ano base de 2019 de 21.078 m3/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

150,47 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Silves 150,47 thousand € ,
Source AD&C, EMRP
18.09.2024