PRR Project

Renovação de Infraestruturas e Criação de ZMC´s no Sistema de Abastecimento de Água do Concelho de São Brás de A

Project sheet

Name

Renovação de Infraestruturas e Criação de ZMC´s no Sistema de Abastecimento de Água do Concelho de São Brás de A

Total project amount

844,15 thousand €

Amount paid

0 €

Non-refundable funding

844,15 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.03.2026

Dimension

Resilience

Component

Water management

Investment

Algarve Regional Water Efficiency Plan

Operation code

03/C09-i01.01/2023.P4666

Summary

A operação apresentada tem como objetivo a "Sustentabilidade no Abastecimento de Água". Com base numa estratégia definida, desde 2021 têm sido executadas várias ações, nomeadamente a colocação de medidores de caudal e válvulas redutoras de pressão, que permitiram uma análise do funcionamento da rede de distribuição de água. Assim, na presente operação são apresentados três projetos de substituição de condutas e ramais em zonas críticas com perdas acentuadas. A antiguidade das infraestruturas de distribuição de água resulta em perdas de água assinaláveis, que comprometem o eficiente fornecimento de água aos consumidores e contribuem para um índice de perdas reais acentuado. A substituição e renovação das mesmas resulta na diminuição de perdas e contribui para a eficiência ambiental e económica dos sistemas de abastecimento. A execução dos projetos que integram a candidatura permitem uma poupança de recurso na ordem de 160 000 m3/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

844,15 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • São Brás de Alportel 844,15 thousand € ,
Source AD&C, EMRP
18.09.2024