PRR Project
RGPD
Project sheet
Name
RGPDTotal project amount
939,25 €Amount paid
281,77 €Non-refundable funding
939,25 €Loan funding
0 €Start date
02.11.2023Expected end date
29.07.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
03/C03-i02/2022.P2238Summary
O projeto prevê a criação de um percurso acessivel desde a garagem até ao interior da moradia, bem como o acesso ao primeiro andar e instalações sanitárias acessíveis. A proposta está consubstanciada nas peças desenhadas visando garantir o cumprimento das normas de acessibilidade, conforme constam na memória descritiva e nas peças desenhadas. As medidas propostas para as áreas comuns do prédio estão previstas no Capítulo 2| S2.7 (aquisição de cadeira elevatória ergonómica) Capítulo 3|S3.3 (substituição da banheira na IS Piso 1 e do poliban na IS do Piso 0 por bases de duche).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
939,25 €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Cascais 939,25 € ,