Jump to main page content
Loading...

Project sheet

Name

RGPD

Total project amount

3,04 thousand €

Amount paid

705 €

Non-refundable funding

3,04 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

03/C03-i02/2022.P2215

Summary

Com o presente projecto pretende-se implementar as seguintes alterações na fração habitacional: 1. Alargamento das portas da instalação sanitária, quarto e sala, de forma a permitir uma largura útil de passagem não inferior a 0,77 me uma altura útil não inferior a 2,00 m, prevendo-se a colocação de novas portas, incluindo aros e guarnições, com exceção da porta de correr em calha superior da instalação sanitária que apresenta 0,85 m e que será recolocada no local, e todos os trabalhos necessários à boa execução da intervenção (contemplando trabalhos de pedreiro, carpinteiro, estuque, pintura e a relocalização de interruptores nos compartimentos que possam ser afetados, entre outros); 2. Alargamento do vão de acesso ao compartimento da cozinha através da supressão da porta de acesso e das saliências das paredes de alvenaria, prevendo-se uma largura útil de passagem de 0,95 me uma altura útil não inferior a 2,00 m, não estando previsto a colocação de qualquer vão para encerramento deste compartimento; 3. As obras na instalação sanitária já se encontram executadas quanto à adaptação para utilização por pessoas com mobilidade condicionada, pelo que, e após a visita ao local, se propõe apenas retirar o painel móvel divisório em vidro, por forma a permitir a existência de uma zona de manobra com o diâmetro não inferior a 1 ,20 m livre de obstáculos. As intervenções a realizar na habitação permitem atingir os seguintes resultados: a) 5,25 m2 de área da obra; b) 70,87 m2 de área útil da habitação; c) 45,08 m2 de área acessível da habitação (inclui apenas o percurso no interior da fração).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

50,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3,04 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 23,2 %,

Where was the money spent

By county

1 county financed .

  • Moita 3,04 thousand € ,
Source AD&C, EMRP
18.09.2024