Jump to main page content
Loading...

Project sheet

Name

rgpd

Total project amount

2,82 thousand €

Amount paid

847,05 €

Non-refundable funding

2,82 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

03/C03-i02/2022.P2103

Summary

De acordo com o Aviso - ponto 4.1 Despesas Elegíveis – o projeto consiste na remoção da banheira e sanita existentes e substituição por uma base de duche e uma sanita adequadas ao uso por pessoas com mobilidade condicionada, nos termos do disposto nas Secções 2.9.4 e 2.9.10 das Norma Técnica de Acessibilidade (NTA), previstas no Anexo do Decreto-Lei n.º 163/2006, de 8 agosto, nomeadamente: \\ 2.9.4. As sanitas acessíveis devem satisfazer as seguintes condições: 1) A altura do piso ao bordo superior do assento da sanita deve ser de 0,45 m, admitindo-se uma tolerância de ± 0,01 m; 2) Existência de zonas livres, que satisfaçam o especificado no n.º 4.1.1, de um dos lados e na parte frontal da sanita; 5) Existência de barras de apoio. \\ 2.9.10. A base de duche acessível que permite a entrada de uma pessoa em cadeira de rodas ao seu interior, deve satisfazer as seguintes condições: 1) O ressalto entre a base de duche e o piso adjacente não deve ser superior a 0,02 m; 2) O piso de base de duche deve ser inclinado na direção do ponto de escoamento, de modo a evitar que a água escorra para o exterior; 3) A inclinação do piso da base de duche não deve ser superior a 2%; 4) O acesso ao interior da base de duche não deve ter uma largura inferior a 0,8m; 6) Junto à base de duche devem ser instaladas barras de apoio. Apresentamos de seguida as datas previstas para a realização do investimento previsto: REALIZAÇÃO FÍSICA: >> Data de Início: 01.NOV.2022 >> Data de Conclusão: 31.JAN.2023 REALIZAÇÃO FINANCEIRA >> Data de Início: 01.NOV.2022 >> Data de Conclusão: 31.MAR.2023

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2,82 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vagos 2,82 thousand € ,
Source AD&C, EMRP
19.09.2024