Name

Programa de Intervenção em Habitações - ABT57

Total project amount

9 thousand €

Amount paid

2,7 thousand €

Non-refundable funding

9 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

03/C03-i02/2022.P1635

Summary

No que se refere à reconstrução do WC é necessário proceder à: substituição do lavatório, sanita, torneiras e espelho de acordo com as normas técnicas de acessibilidades; substituição do atual pavimento para pavimento antiderrapante com boa qualidade de secagem e drenagem, aplicando uma inclinação entre 0,5% / 2% no sentido de escoamento da água; demolição da parede entre WC e o quarto, ou seja, abrir uma ligação entre estas duas divisões de forma a que a cadeira de banho possa circular de forma funcional entre elas, colocando para o efeito uma porta de vidro de correr com puxador; substituição da atual porta do WC por uma que abra para fora e com puxador; substituir o pavimento da entrada do WC por pavimento antiderrapante; instalação da canalização de águas e esgotos na casa de banho, assim como de 1 caixa de visita; colocação de teto em PVC na cor branca e focos de led embutidos e instalação elétrica. Relativamente ao acesso do exterior para o interior da habitação, é necessário proceder à substituição da porta exterior por uma com fecho automático e puxador, bem como, substituir o atual pavimento do hall de entrada da habitação por um com caraterísticas antiderrapantes. Por fim, no quarto, é necessário substituir a atual janela do quarto por uma de correr com corte térmico, e, com estore automático comandado por controlo remoto.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

9 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Abrantes 9 thousand € ,
Source AD&C, EMRP