Project sheet

Name

Residência de Apoio Máximo - Santa Teresinha

Total project amount

399 thousand €

Amount paid

0 €

Non-refundable funding

399 thousand €

Loan funding

0 €

Start date

01.07.2024

Expected end date

30.06.2025

Dimension

Resilience

Component

National Health Service

Investment

Reinforcing the Regional Health Service of the Autonomous Region of Madeira

Operation code

03/C01-i05.01-RAM/2023.P8730

Summary

O projeto de criação de uma nova unidade com 22 camas, Residência de Apoio Máximo na Casa de Saúde Câmara Pestana (CSCP), destina-se a pessoas com elevado grau de incapacidade psicossocial por doença mental grave, clinicamente estabilizada sem suporte familiar ou social adequado. Esta percentagem A CSCP pretende alocar 22 lugares e não 20, como o previsto, assegurando desde já o custo destas duas camas extra, caso não sejam contempladas pelo financiamento em causa.Pretende-se promover a melhoria das suas funções motoras e cognitivas, obter ganhos em saúde e bem-estar, na sua autonomia e funcionalidade, por meio de uma reducação e readaptação funcional, através de um programa desenvolvido pela Equipa Multidisciplinar. Para a implementação desta Residência de Apoio Máximo será necessário requalificar um piso que data de 24 anos. Este Piso, atualmente está a ser utilizado como unidade de Reabilitação Psicossocial.Propomos requalificar e alargar a área de utilização e passar a existir uma Residência de Apoio Máximo com 22 camas, dotando-o de melhores condições de funcionalidade e conforto. Salienta-se que a CSCP, é a única Instituição na Região para internamento de pessoas com doença mental do sexo feminino. Neste sentido, apresentamos a nossa candidatura aos apoios financeiros fundamentada no Investimento C01-i05-RAM: Fortalecimento do Serviço Regional de Saúde da Região Autónoma da Madeira - Aviso N.º 03/C01-i05-RAM/2023: Criação de novas unidades residenciais, designadamente na Tipologia de Cuidados Continuados.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

18,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

399 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Funchal 399 thousand € ,
Source EMRP
10.02.2026