PRR Project

Gas2Biom@ss - OAZ: Descarbonização da unidade fabril de Oliveira de Azeméis através da substituição de gás natural por b

Project sheet

Name

Gas2Biom@ss - OAZ: Descarbonização da unidade fabril de Oliveira de Azeméis através da substituição de gás natural por b

Total project amount

502,98 thousand €

Amount paid

234,65 thousand €

Non-refundable funding

502,98 thousand €

Loan funding

0 €

Start date

28.07.2022

Expected end date

27.11.2023

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

02/C11-i01/2022.PC657883203-00471649

Summary

O Projeto visa a diminuição da emissão de gases com efeito estufa (GEE) na unidade fabril de Oliveira de Azeméis, promovendo a descarbonização da etapa que revela maior consumo energético e impacto ambiental do seu processo produtivo ? a geração de vapor de água, a partir de gás natural. Para tal, pretende-se implementar avançada tecnologia de combustão de biomassa para a geração de vapor, assente na instalação de uma caldeira a biomassa e demais sistemas conexos enquanto alternativa às atuais caldeiras a gás natural existentes. Deste modo, diminuirá a dependência da unidade em termos de combustíveis fósseis e resultará na redução de 2,72% do consumo energético e de 45,23% das emissões de GEE, correspondendo a 8.748 ton de CO2 evitadas anualmente. Com efeito, pretende-se ir de encontro às exigências da EU e nacionais para a transição para uma economia neutra em carbono, perspetivando-se um elevado impacto ambiental, por via da descarbonização da atividade operacional da Lactogal.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,3
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

502,98 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 46,7 %,

Where was the money spent

By county

1 county financed .

  • Porto 502,98 thousand € ,
Source EMRP