PRR Project
Monitorização e Controlo de Perdas Reais de Água no Sistema de Distribuição do Município de Loulé
Project sheet
Name
Monitorização e Controlo de Perdas Reais de Água no Sistema de Distribuição do Município de LouléTotal project amount
475,11 thousand €Amount paid
0 €Non-refundable funding
475,11 thousand €Loan funding
0 €Start date
01.01.2021Expected end date
31.03.2026Dimension
ResilienceComponent
Water managementInvestment
Algarve Regional Water Efficiency PlanOperation code
02/C09-i01.01/2023.P3802Summary
A presente proposta tem por objeto a aquisição e instalação de equipamentos de registo de dados de caudal e pressão, a instalar em captações, estações elevatórias, pontos de entrega de água e VRP´s (Válvulas Redutoras de Pressão) da rede de abastecimento da CM Loulé, com vista à criação de ZMC. A plena operacionalização do projeto proposto e o alcance das metas e resultados propostos na presente candidatura, exige ainda os seguintes investimentos: - Aquisição de equipamentos para registo e armazenamento, comunicação de dados e supervisão das ZMC (hardware e software); - Aquisição e instalação de sistemas digitais de apoio à operação para uma melhor gestão das ZMC; - Aquisição e instalação de equipamentos de telegestão para apoio à gestão conjunta das ZMC.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
475,11 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Loulé 475,11 thousand € ,