PRR Project
Empreitada "Lagoa + Sustentável - Fase 2 - Zona de influência do ponto de entrega da Palmeirinha"
Project sheet
Name
Empreitada "Lagoa + Sustentável - Fase 2 - Zona de influência do ponto de entrega da Palmeirinha"Total project amount
1,69 million €Amount paid
84,02 thousand €Non-refundable funding
1,69 million €Loan funding
0 €Start date
01.01.2021Expected end date
31.03.2026Dimension
ResilienceComponent
Water managementInvestment
Algarve Regional Water Efficiency PlanOperation code
02/C09-i01.01/2023.P3735Summary
O diagnóstico realizado, ao sistema de abastecimento de água, levou ao desenvolvimento de um plano de redução de perdas, que se estrutura ao nível da remodelação/substituição de 7,3 Km de condutas e a criação de 47 ZMC; A operação consiste no i) escavação e abertura de vala, para assentamento da tubagem incluindo entivação, embaraços e as sondagens necessárias de reconhecimento das infraestruturas existentes; ii) fornecimento e assentamento de tubagem incluindo ligações e acessórios e iii) levantamento e reposição do pavimento. A operação contempla a criação de 47 ZMC’s, essenciais ao processo de controlo da rede, comparando situações de consumo, quer com o histórico a criar, quer com o previsível teoricamente. As ZMC,s possuem uma dimensão reduzida (respeitando os limites comummente aceites para as ZMC’s, ou seja, 5 a 10 km de extensão e até 3.000 ramais) o que facilita a deteção das alterações nos padrões de consumo, que poderão indiciar situações anómalas, como roubos de água ou roturas. Este último aspeto é muito importante porque permitirá elaborar uma estratégia de Controle Ativo de Perdas (CAP) mais eficiente, nomeadamente escolhendo criteriosamente os locais mais prioritários para o fazer. O investimento divide se entre as componentes “Construção diversas de rede” no valor de 1 557 543,36 € e “Equipamento básico” com um investimento de 304 362,30€, perfazendo o montante global de investimento de 1 861 905,66 €.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
1,69 million €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 5 %,Where was the money spent
By county
1 county financed .
-
Lagoa 1,69 million € ,