Name

Escola Ciência Viva de Bragança

Total project amount

20 thousand €

Amount paid

8,15 thousand €

Non-refundable funding

20 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

Qualifications and Skills

Investment

CTEAM Youth Incentive

Operation code

02/C06-i04.02/2021.P56

Summary

A ECVB dispõe de um espaço físico adequado ao ensino experimental das ciências do qual fazem parte: (i) sala/laboratório; (ii) áreas de exposição interativas; (iii) rio Fervença e as suas margens nas imediações do CCVB. As parcerias estabelecidas por acordos institucionais em 2018, descritas neste formulário, são renovadas anualmente e permitem o funcionamento regular e continuado da ECVB. A ECVB possui um programa educativo próprio e original que articula o programa da Escola Ciência Viva para alunos e o programa da Escola Ciência Viva para professores. Conta com a colaboração de todos os parceiros, em especial dos professores das diferentes escolas envolvidas e de investigadores do Instituto Politécnico de Bragança. Ampliação do espaço físico; Pretende-se em 2022 (e anos seguintes) estabelecer 3 novas zonas, ampliando o espaço físico da ECVB, a saber: (i) uma zona de trabalho num dos socalcos das margens do rio Fervença com a criação de um laboratório ao ar livre (horta/compostor/ensaios), (ii) uma área de robótica no Edifício Sede e (iii) um Estúdio fotográfico/gravação. Ampliação do número de alunos abrangidos anualmente Para além de todos os alunos de 4ºano do concelho de Bragança que já integram o programa anual da ECVB, pretende-se iniciar um projeto piloto que irá envolver mais 3 turmas de alunos por ano, fazendo assim um total aproximado de 350 alunos/ano. Diversificação dos anos de escolaridade envolvidos Integrarão o projeto piloto três turmas de 1ºano que continuarão a frequentar a ECV no 2º, 3º e 4ºano de escolaridade. Será assim desenvolvido e aplicado um programa educativo do 1º ao 4ºano, em colaboração com as Escolas parceiras neste projeto, nomeadamente o IPB.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

7,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

20 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 40,8 %,

Where was the money spent

By county

1 county financed .

  • Bragança 20 thousand € ,