Jump to main page content
Loading...

PRR Project

PT Smart Retail: Portugal como referência para a nova geração de retalho autónomo e inteligente

Project sheet

Name

PT Smart Retail: Portugal como referência para a nova geração de retalho autónomo e inteligente

Total project amount

17,6 million €

Amount paid

6,02 million €

Non-refundable funding

17,6 million €

Loan funding

0 €

Start date

01.07.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

Investment and innovation

Investment

Mobilizing Agendas/Alliances for Business Innovation

Operation code

02/C05-i01.01/2022.PC645440011-00000062

Summary

A presente Agenda visa o desenvolvimento, demonstração e industrialização de tecnologias de suporte a uma nova geração de retalho, com incorporação de tecnologia 100% nacional, incluindo soluções de desmaterialização de processos aplicadas ao setor que permitam conferir uma experiência seamless e de ultra comodidade aos seus utilizadores, com relevante eficiência económica e ambiental e um potencial de internacionalização assinalável, contribuindo para direcionar o perfil de especialização do país para soluções de elevado valor acrescentado e para a geração de riqueza e emprego. Neste contexto, visa-se o desenvolvimento de novos formatos de retalho, nomeadamente de lojas autónomas/híbridas (com 500 e 1500 m2), de Pods (i.e., lojas autónomas contentorizadas com ~15m2, facilmente instaladas em diferentes localizações), de Zero Waste Cabinets (solução de vending do futuro), assim como de tecnologias periféricas capazes de incrementar a user experience dos consumidores.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

17,6 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 34,2 %,

Where was the money spent

By county

10 counties financed .

  • Lisboa 5,28 million € ,
  • Castelo Branco 3,94 million € ,
  • Matosinhos 2,88 million € ,
  • Braga 1,52 million € ,
  • Vila Nova de Famalicão 1,44 million € ,
Source AD&C, EMRP
10.05.2024