Jump to main page content
Loading...

Project sheet

Name

Desporto com arte

Total project amount

150,71 thousand €

Amount paid

86,73 thousand €

Non-refundable funding

150,71 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

02/C03-i06.03/2022.P3049

Summary

Ação 1 - Regeneração/Requalificação física de instalações desportivas e espaço público do Conjunto Habitacional Municipal de Vila Nova do Campo: A intervenção prevê a valorização dos espaços exteriores existentes, a saber: a área do campo de jogos, que serve o complexo habitacional, mas também a comunidade local envolvente, nomeadamente a comunidade escolar vizinha. Assim como, a redução dos encargos com a manutenção e gestão, através do aumento de áreas permeáveis revestidas a inertes, diminuindo as áreas de sementeira de prado e consequentemente os encargos com as necessidades de corte e podas de formação associadas. Ação 2 – Requalificação do polidesportivo do Complexo Desportivo Municipal na cidade de Santo Tirso: A intervenção prevê substituição do piso do atual polidesportivo e adaptação do mesmo a Basket Art. O 3x3 BasketArt é um projeto que faz parte de um programa nacional de promoção do basquetebol que tem como objetivo trazer a modalidade para a rua, num cenário de arte urbana, com vista à promoção de hábitos saudáveis de vida dos seus habitantes, principalmente dos jovens, através da prática informal do basquetebol. Esta ação engloba ainda uma solução informática que desmaterializa o processo de Inscrição, Pagamento e Controlo de Acessos aos Espaços. Esta solução simplifica e torna mais simples, rápida, cómoda e eficaz o acesso aos equipamentos desportivos, fomentando, desta forma a prática desportiva.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

150,71 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 57,5 %,

Where was the money spent

By county

1 county financed .

  • Santo Tirso 150,71 thousand € ,
Source AD&C, EMRP
11.09.2024