PRR Project
GondoMOB
Project sheet
Name
GondoMOBTotal project amount
383,6 thousand €Amount paid
38,36 thousand €Non-refundable funding
383,6 thousand €Loan funding
0 €Start date
01.01.2021Expected end date
31.12.2025Dimension
ResilienceComponent
Social InterventionInvestment
Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and PortoOperation code
02/C03-i06.03/2022.P3005Summary
A Operação “GondoMOB”, que corresponde à Ação 1.28. inscrita no Quadro de Investimentos do PAOITI AMP Centro-Oriental, prevê a realização de 4 Ações, designadamente: Ação n.º 1 - Criação de modelo de transporte porta-a-porta, com início previsto para 01 de janeiro de 2023 e término a 31 de dezembro de 2025, Ação n.º 2 - Operacionalização de transporte - Freguesia da Lomba; Ação n.º 3 - Operacionalização de transporte - Freguesias da Foz do Sousa e Covelo; Ação n.º 4 - Operacionalização de transporte - Freguesias de Melres e Medas, com início previsto para 01 de julho de 2023 e conclusão a 31 de dezembro de 2025. As Ações contemplam a aquisição de Viaturas Elétricas transformadas para transporte de pessoas com mobilidade reduzida, a contratação de Assistentes Operacionais (Motoristas), a aquisição e instalação de Postos de Carregamento de Viaturas Elétricas, um por freguesia (Lomba, Melres, Medas, Foz do Sousa e Covelo), bem como outras despesas imprescindíveis à operacionalização da Operação Neste sentido, as despesas abrangem as seguintes tipologias: b) Máquinas, equipamentos e hardware; c) Viaturas e outro material circulante; j) Outras despesas e serviços diversos; l) Gastos com pessoal e contratação, apenas são admitidos nas situações em que se revelem imprescindíveis à execução do projeto, e contratados pelo período estritamente necessário para a implementação do projeto. A Operação “GondoMOB” apresenta um investimento total de 471.822,22 euros, dos quais 383.595,30 euros correspondem a investimento elegível e 88.226,92 euros a investimento não elegível (valor do IVA), e apresenta uma estrutura de custos devidamente suportada e justificada no orçamento global e documentos de suporte. Espera-se que o investimento elegível da Operação seja financiado a 100%, no âmbito do Aviso a que se candidata.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
383,6 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 10 %,Where was the money spent
By county
1 county financed .
-
Gondomar 383,6 thousand € ,