Jump to main page content
Loading...

Project sheet

Name

Acompanhamento, Monitorização e Avaliação

Total project amount

130,35 thousand €

Amount paid

4,65 thousand €

Non-refundable funding

130,35 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

02/C03-i06.03/2022.P1172

Summary

O projeto materializa-se nas seguintes ações: Criação de uma equipa multidisciplinar constituída por dois técnicos superiores, um na área das Ciências empresariais/ Finanças e outro na área do Planeamento Regional e Urbano, cujo perfil profissional permitirá acompanhar, monitorizar e avaliar todo o processo de apresentação de candidaturas a operações individuais do território. Esta equipa ficará afeta em exclusivo às operações a integrar no âmbito da candidatura – operações integradas em comunidades desfavorecidas na área Metropolitana do Porto e terá por grande objetivo envolver, capacitar e rentabilizar parcerias e preparar a comunidade com instrumentos e estratégias que assegurem a eficácia e eficiência das operações, num modo de funcionamento integrado, sustentabilidade e continuidade das ações. Esta operação será, em termos gerais, fundamental para que o município/ território se mobilize para atingir o sucesso e construir o futuro dos seus territórios, por intermédio de um comportamento articulado, capacitado, integrado e proactivo, considerando as suas realidades atuais e os desafios futuros, uma vez que o Município não dispõe de recursos humanos internos que possa envolver diretamente no acompanhamento, monitorização e avaliação, processos fundamentais ao desenvolvimento das diferentes operações.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

130,35 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 3,6 %,

Where was the money spent

By county

1 county financed .

  • Arouca 130,35 thousand € ,
Source AD&C, EMRP
18.09.2024