Project sheet

Name

Escola Básica de Vila de Punhe

Total project amount

8,3 thousand €

Amount paid

2,49 thousand €

Non-refundable funding

8,3 thousand €

Loan funding

0 €

Start date

03.10.2022

Expected end date

30.12.2022

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P866

Summary

O investimento a concretizar na Escola Básica de Vila de Punhe, através de uma única empreitada, incidirá na adaptação das instalações sanitárias e ao nível da correção de desníveis existentes com a implementação de rampa de acesso, de modo a responder às necessidades dos seus utentes, no caso em particular, as pessoas com mobilidade reduzida.Esta intervenção prevê a remoção de louças sanitárias existentes, demolição de paredes divisórias, de revestimento de paredes e de pavimentos; adaptação de redes de drenagem de águas residuais e abastecimento de água para a nova situação; fornecimento e assentamento de revestimento cerâmico em paredes e pavimento; fornecimento e montagem de novas louças sanitárias (lavatório e sanita) adaptadas para mobilidade reduzida, incluindo torneiras misturadoras, apoios basculantes; fornecimento e instalação de sistema de chamada de emergência para WC; fornecimento e instalação de termoacumulador elétrico de 80L; fornecimento de dispensador de sabão, dispensador de toalhas de papel e escova piaçaba e o fornecimento e colocação de porta de abrir (a abrir no sentido da “saída”).O edifício necessita, ainda, de intervenção ao nível da correção de desníveis, apesar de já terem sido construídas algumas rampas, o átrio principal ainda mantém os degraus originais, estando prevista a implementação de três rampas.A presente intervenção é elemento fundamental para melhorar a qualidade de vida de todos os cidadãos que usufruem deste edifício público, de forma mais acentuada para aqueles que tem limitações de mobilidade, assegurando a sua autonomia e a sua integração plena na sociedade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

8,3 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Viana do Castelo 8,3 thousand € ,
Source EMRP
23.12.2024