PRR Project
Escola Básica Educadora Zaida Garcez - Acessibilidades
Project sheet
Name
Escola Básica Educadora Zaida Garcez - AcessibilidadesTotal project amount
5,95 thousand €Amount paid
1,78 thousand €Non-refundable funding
5,95 thousand €Loan funding
0 €Start date
03.10.2022Expected end date
30.12.2022Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
02/C03-i02/2021.P861Summary
O investimento, concretizado através de uma empreitada, irá permitir a requalificação/adaptação de uma casa de banho, na Escola Básica Educadora Zaida Garcez em Darque, para pessoas com mobilidade reduzida.A intervenção incluí a adaptação da rede de abastecimento de água no WC e ampliação de drenagem de águas residuais com ligação ao sifão, a demolição de parede em alvenaria de tijolo e o revestimento cerâmico, incluindo transporte de produtos sobrantes a vazadouro, fornecimento e assentamento de azulejo e de revestimento cerâmico antiderrapante. Incluí a remoção e colocação de louças sanitárias, fornecimento e montagem de banco de chuveiro rebatível, colocação de apoio fixo (barra de apoio) e fornecimento e montagem de porta interior, bem como todos os acessórios necessários e indispensáveis à utilização deste tipo de infraestruturas.A presente intervenção é elemento fundamental para melhorar a qualidade de vida de todos os cidadãos que usufruem deste edifício público, de forma mais acentuada para aqueles que tem limitações de mobilidade, assegurando a sua autonomia e a sua integração plena na sociedade.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
5,95 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Viana do Castelo 5,95 thousand € ,