Adaptação do Arquivo Histórico de Albufeira
Project sheet
Name
Adaptação do Arquivo Histórico de AlbufeiraTotal project amount
8,62 thousand €Amount paid
2,59 thousand €Non-refundable funding
8,62 thousand €Loan funding
0 €Start date
01.09.2022Expected end date
31.12.2022Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
02/C03-i02/2021.P849Summary
A operação tem como objetivo principal alterar o uso de uma das salas do piso térreo passando-a a sala de leitura, podendo assim ser utilizada por pessoas que não têm capacidade de subir até ao primeiro piso do edifício, onde se situa atualmente a sala de leitura. Esta sala é acessível e possui iluminação e ventilação natural, colocando-se apenas um novo pavimento vinílico sobre o existente de forma a uniformizar todos os espaços públicos no piso térreo.Pretende-se ainda remodelar totalmente a instalação sanitária de forma a instalar equipamentos acessíveis e possibilitar os espaços de circulação necessários, com a colocação de novos revestimentos e pavimento.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
8,62 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Albufeira 8,62 thousand € ,